Substation Scout

Platte, NE interconnection queue

2 active projects totaling 80 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2active projects
80active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2006-038N003 Not reported n/r 100 Wind Withdrawn
GEN-2004-023N Not reported 115 75 Coal Operational
GEN-2004-017N Not reported n/r 5 Hydro Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first