Perkins, SD interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-020 Not reported 230 250 Wind Withdrawn
GEN-2023-098 Not reported 230 200 Hybrid Withdrawn
GEN-2022-066 Not reported 230 150 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.