Perkins, NE interconnection queue

1 active project totaling 120 MW in the SPP queue, plus 1 with terminal status (shown grayed).

1active projects
120active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-037 Not reported 345 244.2 Wind Withdrawn
GEN-2023-153 Not reported 115 120 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.