1 active project totaling 128 MW in the SPP queue, plus 1 with terminal status (shown grayed).

1active projects
128active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-097 Not reported 115 128 Solar Operational
GEN-2017-096 Not reported 115 25 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.