Substation Scout

Pawnee, KS interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2010-061 Not reported 345 180 Wind Withdrawn
GEN-2008-122 Not reported n/r 105 Wind Withdrawn
GEN-2009-015 Not reported 230 72 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first