Substation Scout

Parmer, TX interconnection queue

2 active projects totaling 565 MW in the SPP queue, plus 9 with terminal status (shown grayed).

2active projects
565active MW
11total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-099 Not reported 230 300 Wind Active
GEN-2022-217 Not reported 230 275 Wind Withdrawn
GEN-2017-158 Not reported 230 265 Wind Active
GEN-2016-099 Not reported 230 250 Wind Withdrawn
GEN-2018-124 Not reported 230 200 Solar Withdrawn
GEN-2018-112 Not reported 230 185 Solar Withdrawn
GEN-2018-097 Not reported 230 100 Solar Withdrawn
GEN-2018-111 Not reported 230 75 Battery Withdrawn
GEN-2008-116 Not reported n/r 70 Wind Withdrawn
GEN-2008-052 Not reported n/r 65 Wind Withdrawn
GEN-2016-117 Not reported 230 50 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.