0 active projects
totaling 0 MW in the SPP queue, plus 7 with terminal status (shown grayed).
0active projects
0active MW
7total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2016-127
Not reported
138
200.1
Wind
Withdrawn
GEN-2011-006
Not reported
138
200
Wind
Withdrawn
GEN-2022-129
Not reported
138
200
Battery
Withdrawn
GEN-2008-038
Not reported
n/r
144
Wind
Withdrawn
GEN-2012-027
Not reported
138
136
Wind
Withdrawn
GEN-2016-048
Not reported
138
82.3
Solar
Withdrawn
GEN-2022-060
Not reported
138
55
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.