2 active projects totaling 500 MW in the SPP queue, plus 7 with terminal status (shown grayed).

2active projects
500active MW
9total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-125 Not reported 345 252 Wind Withdrawn
GEN-2017-127 Not reported 345 252 Wind Withdrawn
GEN-2020-071 Not reported 230 252 Wind Withdrawn
GEN-2023-220 Not reported 345 250 Solar Active
GEN-2023-221 Not reported 345 250 Solar Active
GEN-2017-130 Not reported 345 215 Wind Withdrawn
GEN-2017-191 Not reported 345 201.6 Solar Withdrawn
GEN-2023-219 Not reported 115 125 Solar Withdrawn
GEN-2017-192 Not reported 345 52 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.