Oldham, TX interconnection queue

2 active projects totaling 400.2 MW in the SPP queue, plus 10 with terminal status (shown grayed).

2active projects
400.2active MW
12total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-084 Not reported n/r 300 Wind Withdrawn
GEN-2022-116 Not reported 345 250 Wind Withdrawn
GEN-2022-117 Not reported 345 250 Wind Withdrawn
GEN-2022-118 Not reported 345 250 Wind Withdrawn
GEN-2022-119 Not reported 345 250 Wind Withdrawn
GEN-2022-120 Not reported 345 250 Wind Withdrawn
GEN-2022-121 Not reported 345 250 Wind Withdrawn
GEN-2022-122 Not reported 345 250 Wind Withdrawn
GEN-2022-127 Not reported 230 250 Wind Withdrawn
GEN-2002-022 Not reported 230 239.2 Wind Operational
GEN-2008-051 Not reported 345 161 Wind Operational
GEN-2008-088 Not reported 69 50.6 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.