Oldham, TX interconnection queue
2 active projects totaling 400.2 MW in the SPP queue, plus 10 with terminal status (shown grayed).
2active projects
400.2active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2008-084 | Not reported | n/r | 300 | Wind | Withdrawn |
| GEN-2022-116 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-117 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-118 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-119 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-120 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-121 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-122 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-127 | Not reported | 230 | 250 | Wind | Withdrawn |
| GEN-2002-022 | Not reported | 230 | 239.2 | Wind | Operational |
| GEN-2008-051 | Not reported | 345 | 161 | Wind | Operational |
| GEN-2008-088 | Not reported | 69 | 50.6 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.