Newton, MO interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-149 Not reported 161 250 Battery Withdrawn
GEN-2020-053 Not reported 345 240 Wind Withdrawn
GEN-2017-148 Not reported 161 202 Wind Withdrawn
GEN-2022-113 Not reported 161 200 Solar Withdrawn
GEN-2024-037 Not reported 345 200 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first