New Madrid, MO interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-202 Not reported 161 200 Solar Withdrawn
GEN-2018-094 Not reported 161 200 Solar Withdrawn
GEN-2018-113 Not reported 161 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.