Neosho, KS interconnection queue

2 active projects totaling 349 MW in the SPP queue.

2active projects
349active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-009 Not reported 345 302 Wind Operational
GEN-2001-018 Not reported n/r 47 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.