Neosho, KS interconnection queue
2 active projects totaling 349 MW in the SPP queue.
2active projects
349active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2017-009 | Not reported | 345 | 302 | Wind | Operational |
| GEN-2001-018 | Not reported | n/r | 47 | Gas | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.