3 active projects totaling 906 MW in the SPP queue, plus 6 with terminal status (shown grayed).

3active projects
906active MW
9total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-150 Not reported 345 302 Wind Operational
GEN-2016-174 Not reported 345 302 Wind Operational
GEN-2016-176 Not reported 345 302 Wind Operational
GEN-2018-120 Not reported 161 200 Wind Withdrawn
GEN-2014-051 Not reported 345 174 Wind Withdrawn
GEN-2015-074 Not reported 345 174 Wind Withdrawn
GEN-2013-042 Not reported n/r 173 Wind Withdrawn
GEN-2007-015 Not reported 161 135 Wind Withdrawn
GEN-2016-170 Not reported 115 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.