0 active projects totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2014-018 Not reported 345 756.8 Gas Withdrawn
GEN-2014-017 Not reported 345 477 Gas Withdrawn
GEN-2014-016 Not reported 345 227 Gas Withdrawn
GEN-2001-034 Not reported n/r 100 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.