Muskogee, OK interconnection queue
7 active projects totaling 1,577 MW in the SPP queue, plus 10 with terminal status (shown grayed).
7active projects
1,577active MW
17total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2000-011 | Not reported | n/r | 825 | Gas | Withdrawn |
| GEN-2025-SR9 | Not reported | 345 | 410 | Other | Active |
| GEN-2024-268 | Not reported | 345 | 390 | Solar | Active |
| GEN-2022-224 | Not reported | 345 | 325 | Solar | Withdrawn |
| GEN-2017-155 | Not reported | 345 | 300 | Wind | Withdrawn |
| GEN-2021-053 | Not reported | 345 | 300 | Solar | Active |
| GEN-2017-092 | Not reported | 345 | 200 | Solar | Active |
| GEN-2022-225 | Not reported | 345 | 200 | Battery | Withdrawn |
| GEN-2022-226 | Not reported | 345 | 200 | Battery | Withdrawn |
| GEN-2023-131 | Not reported | 345 | 200 | Hybrid | Withdrawn |
| GEN-2023-145 | Not reported | 161 | 180 | Solar | Withdrawn |
| GEN-2025-SR7 | Not reported | 115 | 102 | Battery | Active |
| GEN-2018-024 | Not reported | 345 | 100 | Battery | Active |
| GEN-2021-052 | Not reported | 345 | 75 | Battery | Active |
| GEN-2018-051 | Not reported | 345 | 35 | Battery | Withdrawn |
| GEN-2005-018 | Not reported | n/r | 32 | Gas | Withdrawn |
| GEN-2021-SR2 | Not reported | n/r | 21.4 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.