Substation Scout

Morris, TX interconnection queue

2 active projects totaling 1,214.6 MW in the SPP queue.

2active projects
1,214.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-204 Not reported 345 914.6 Gas Active
GEN-2024-068 Not reported 345 300 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first