Queue IDProjectkVMWResourceStatus
GEN-2002-007 Not reported n/r 1,100 Wind Withdrawn
GEN-2000-003 Not reported n/r 280 Gas Withdrawn
GEN-2008-108 Not reported n/r 198 Wind Withdrawn
GEN-2023-109 Not reported 115 65 Solar Withdrawn
GEN-2007-057 Not reported 115 34.5 Wind Withdrawn
GEN-2009-023S Not reported 115 18 Wind Withdrawn
GEN-2009-024S Not reported 115 18 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.