0 active projects
totaling 0 MW in the SPP queue, plus 7 with terminal status (shown grayed).
0active projects
0active MW
7total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2002-007
Not reported
n/r
1,100
Wind
Withdrawn
GEN-2000-003
Not reported
n/r
280
Gas
Withdrawn
GEN-2008-108
Not reported
n/r
198
Wind
Withdrawn
GEN-2023-109
Not reported
115
65
Solar
Withdrawn
GEN-2007-057
Not reported
115
34.5
Wind
Withdrawn
GEN-2009-023S
Not reported
115
18
Wind
Withdrawn
GEN-2009-024S
Not reported
115
18
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.