Meade, SD interconnection queue
2 active projects totaling 300 MW in the SPP queue, plus 2 with terminal status (shown grayed).
2active projects
300active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2017-098 | Not reported | 230 | 200 | Wind | Withdrawn |
| GEN-2024-282 | Not reported | 230 | 150 | Solar | Active |
| GEN-2024-283 | Not reported | 230 | 150 | Solar | Active |
| GEN-2022-067 | Not reported | 115 | 85 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.