Substation Scout

Meade, SD interconnection queue

2 active projects totaling 300 MW in the SPP queue, plus 2 with terminal status (shown grayed).

2active projects
300active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-098 Not reported 230 200 Wind Withdrawn
GEN-2024-282 Not reported 230 150 Solar Active
GEN-2024-283 Not reported 230 150 Solar Active
GEN-2022-067 Not reported 115 85 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first