Mcpherson, KS interconnection queue
2 active projects totaling 602 MW in the SPP queue, plus 11 with terminal status (shown grayed).
2active projects
602active MW
13total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2016-114 | Not reported | 345 | 310 | Wind | Withdrawn |
| GEN-2017-205 | Not reported | 230 | 310 | Solar | Withdrawn |
| GEN-2018-032 | Not reported | 345 | 310 | Wind | Withdrawn |
| GEN-2016-111 | Not reported | 345 | 302 | Wind | Active |
| GEN-2017-206 | Not reported | 345 | 300 | Solar | Withdrawn |
| GEN-2017-209 | Not reported | 345 | 300 | Solar | Withdrawn |
| GEN-2017-211 | Not reported | 345 | 300 | Solar | Withdrawn |
| GEN-2024-142 | Not reported | 345 | 300 | Wind | Active |
| GEN-2017-204 | Not reported | 345 | 210 | Solar | Withdrawn |
| GEN-2014-011 | Not reported | 345 | 172 | Gas | Withdrawn |
| GEN-2004-016 | Not reported | n/r | 150 | Wind | Withdrawn |
| GEN-2017-208 | Not reported | 138 | 150 | Solar | Withdrawn |
| GEN-2024-047 | Not reported | 115 | 123.7 | Gas | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.