Substation Scout

Mclean, ND interconnection queue

1 active project totaling 0 MW in the SPP queue, plus 1 with terminal status (shown grayed).

1active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-031 Not reported 230 200 Solar Withdrawn
GEN-2025-GR3 Not reported n/r 0 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first