Mcintosh, OK interconnection queue
3 active projects totaling 501 MW in the SPP queue, plus 3 with terminal status (shown grayed).
3active projects
501active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2023-022 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-074 | Not reported | 138 | 220.9 | Wind | Withdrawn |
| GEN-2023-041 | Not reported | 138 | 190 | Solar | Withdrawn |
| GEN-2024-296 | Not reported | 345 | 167 | Solar | Active |
| GEN-2024-297 | Not reported | 345 | 167 | Solar | Active |
| GEN-2024-298 | Not reported | 345 | 167 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.