Marshall, OK interconnection queue
1 active project totaling 200 MW in the SPP queue, plus 2 with terminal status (shown grayed).
1active projects
200active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2023-020 | Not reported | 138 | 220 | Solar | Withdrawn |
| GEN-2024-031 | Not reported | 138 | 220 | Solar | Withdrawn |
| GEN-2022-143 | Not reported | 138 | 200 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.