Marion, TX interconnection queue

3 active projects totaling 360 MW in the SPP queue.

3active projects
360active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-122 Not reported 138 160 Hybrid Active
GEN-2022-111 Not reported 345 150 Hybrid Active
GEN-2024-305 Not reported 69 50 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.