Marion, KS interconnection queue

1 active project totaling 200.6 MW in the SPP queue, plus 3 with terminal status (shown grayed).

1active projects
200.6active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-162 Not reported 345 252 Wind Withdrawn
GEN-2014-001 Not reported 345 200.6 Wind Operational
GEN-2013-020 Not reported 345 200.1 Wind Withdrawn
GEN-2018-002 Not reported n/r 200 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.