Major, OK interconnection queue

1 active project totaling 200 MW in the SPP queue, plus 4 with terminal status (shown grayed).

1active projects
200active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2015-048 Not reported 138 200 Wind Operational
GEN-2010-030 Not reported 138 150 Wind Withdrawn
GEN-2019-061 Not reported 138 150 Solar Withdrawn
GEN-2016-107 Not reported 138 141.8 Wind Withdrawn
GEN-2022-064 Not reported 138 80 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.