Lyon, KS interconnection queue

4 active projects totaling 1,075.1 MW in the SPP queue, plus 4 with terminal status (shown grayed).

4active projects
1,075.1active MW
8total filed
Queue IDProjectkVMWResourceStatus
GEN-2015-051 Not reported n/r 916 Gas Withdrawn
GEN-2015-050 Not reported 345 464 Gas Withdrawn
GEN-2006-027 Not reported 345 380 Gas Operational
GEN-2006-028 Not reported 345 360 Gas Operational
GEN-2009-005 Not reported n/r 200.1 Wind Withdrawn
GEN-2015-073 Not reported 345 200.1 Wind Operational
GEN-2024-358 Not reported 161 145.4 Solar Withdrawn
GEN-2022-007 Not reported 115 135 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.