Lubbock, TX interconnection queue

4 active projects totaling 809 MW in the SPP queue, plus 5 with terminal status (shown grayed).

4active projects
809active MW
9total filed
Queue IDProjectkVMWResourceStatus
GEN-2009-002 Not reported 230 306 Gas Withdrawn
GEN-2022-141 Not reported 230 250 Battery Withdrawn
GEN-2010-006 Not reported 230 205 Gas Operational
GEN-2011-045 Not reported 230 205 Gas Operational
GEN-2020-060 Not reported 230 200 Battery Active
GEN-2024-355 Not reported 230 199 Battery Active
GEN-2024-356 Not reported 230 199 Battery Withdrawn
GEN-2009-001 Not reported 230 128 Gas Withdrawn
GEN-2007-031 Not reported n/r 51 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.