Substation Scout

Little River, AR interconnection queue

1 active project totaling 204.1 MW in the SPP queue, plus 7 with terminal status (shown grayed).

1active projects
204.1active MW
8total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-036 Not reported 138 204.1 Solar Active
GEN-2022-045 Not reported 138 200 Battery Withdrawn
GEN-2022-047 Not reported 138 200 Solar Withdrawn
GEN-2024-115 Not reported 138 199 Hybrid Withdrawn
GEN-2018-023 Not reported 138 126 Solar Withdrawn
GEN-2022-088 Not reported 138 75 Solar Withdrawn
GEN-2022-089 Not reported 138 75 Battery Withdrawn
GEN-2017-003 Not reported 69 21.6 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.