0 active projects
totaling 0 MW in the SPP queue, plus 6 with terminal status (shown grayed).
0active projects
0active MW
6total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2019-028
Not reported
345
400
Solar
Withdrawn
GEN-2020-051
Not reported
345
250
Solar
Withdrawn
GEN-2007-010N
Not reported
n/r
100
Wind
Withdrawn
GEN-2007-010N03
Not reported
n/r
100
Wind
Withdrawn
GEN-2007-010N04
Not reported
n/r
100
Wind
Withdrawn
GEN-2007-010N05
Not reported
n/r
100
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.
Site Scanner