Leavenworth, KS interconnection queue
3 active projects totaling 799 MW in the SPP queue, plus 5 with terminal status (shown grayed).
3active projects
799active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2001-009 | Not reported | n/r | 640 | Gas | Withdrawn |
| GEN-2001-010 | Not reported | n/r | 640 | Gas | Withdrawn |
| GEN-2024-253 | Not reported | 345 | 300 | Hybrid | Active |
| GEN-2024-339 | Not reported | 115 | 300 | Battery | Active |
| GEN-2018-058 | Not reported | 345 | 252 | Solar | Withdrawn |
| GEN-2018-059 | Not reported | 345 | 252 | Solar | Withdrawn |
| GEN-2024-121 | Not reported | 115 | 199 | Battery | Active |
| GEN-2017-123 | Not reported | 345 | 180 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.