Lawrence, MO interconnection queue

1 active project totaling 167 MW in the SPP queue, plus 3 with terminal status (shown grayed).

1active projects
167active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2003-014 Not reported n/r 550 Coal Withdrawn
GEN-2024-066 Not reported 161 199 Battery Withdrawn
GEN-2024-084 Not reported 161 167 Battery Active
GEN-2018-006 Not reported 161 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.