3 active projects totaling 1,410 MW in the SPP queue, plus 3 with terminal status (shown grayed).

3active projects
1,410active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-129 Not reported 345 910 Gas Active
GEN-2023-050 Not reported 345 400 Hybrid Withdrawn
GEN-2021-006 Not reported 345 300 Battery Active
GEN-2020-052 Not reported 345 251 Wind Withdrawn
GEN-2022-005 Not reported 138 200 Solar Withdrawn
GEN-2022-006 Not reported 161 200 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.