GEN-2021-007 Not reported 345 600 Wind Withdrawn
GEN-2006-038N009 Not reported n/r 250 Wind Withdrawn
GEN-2016-165 Not reported 345 202 Wind Withdrawn
GEN-2023-216 Not reported 345 200 Wind Withdrawn
GEN-2023-217 Not reported 345 200 Wind Withdrawn
GEN-2023-218 Not reported 345 200 Wind Withdrawn
GEN-2019-033 Not reported 345 182 Solar Withdrawn
GEN-2018-130 Not reported 230 122 Wind Withdrawn
GEN-2018-056 Not reported 345 102.6 Solar Withdrawn
GEN-2007-011N08 Not reported 115 81 Wind Operational
GEN-2012-005 Not reported 230 81 Wind Withdrawn
GEN-2014-023 Not reported 230 79.9 Wind Withdrawn
GEN-2007-011N09 Not reported n/r 75 Wind Withdrawn
GEN-2006-020N Not reported 115 42 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first