1 active project totaling 104 MW in the SPP queue, plus 4 with terminal status (shown grayed).

1active projects
104active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2012-012 Not reported 345 200 Wind Withdrawn
GEN-2022-190 Not reported 345 200 Wind Withdrawn
GEN-2022-194 Not reported 345 200 Wind Withdrawn
GEN-2001-039A Not reported 115 104 Wind Operational
GEN-2021-022 Not reported 115 75 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.