Keith, NE interconnection queue
0 active projects totaling 0 MW in the SPP queue, plus 9 with terminal status (shown grayed).
0active projects
0active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2023-116 | Not reported | 345 | 500 | Wind | Withdrawn |
| GEN-2019-029 | Not reported | 345 | 404 | Wind | Withdrawn |
| GEN-2016-106 | Not reported | 345 | 400 | Wind | Withdrawn |
| GEN-2018-017 | Not reported | 230 | 302.4 | Wind | Withdrawn |
| GEN-2023-117 | Not reported | 345 | 300 | Wind | Withdrawn |
| GEN-2013-021 | Not reported | 230 | 229.5 | Wind | Withdrawn |
| GEN-2023-071 | Not reported | 115 | 200 | Hybrid | Withdrawn |
| GEN-2014-059 | Not reported | 230 | 160 | Wind | Withdrawn |
| GEN-2018-016 | Not reported | 115 | 100.8 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.