Kearny, KS interconnection queue

2 active projects totaling 300 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2active projects
300active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-172 Not reported 345 200 Wind Active
GEN-2021-084 Not reported 115 180 Hybrid Withdrawn
GEN-2023-173 Not reported 345 100 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.