0 active projects totaling 0 MW in the SPP queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-119 Not reported 345 400 Wind Withdrawn
GEN-2018-042 Not reported 345 300 Wind Withdrawn
GEN-2011-055 Not reported 69 52.8 Wind Withdrawn
GEN-2019-075 Not reported 69 24 Solar Withdrawn
GEN-2019-076 Not reported 69 14 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.