Jefferson, NE interconnection queue
4 active projects totaling 128.8 MW in the SPP queue, plus 7 with terminal status (shown grayed).
4active projects
128.8active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2023-011 | Not reported | 115 | 190 | Wind | Withdrawn |
| GEN-2015-100 | Not reported | 115 | 120 | Wind | Withdrawn |
| GEN-2016-109 | Not reported | 115 | 102 | Wind | Withdrawn |
| GEN-2006-038N004 | Not reported | n/r | 100 | Wind | Withdrawn |
| GEN-2010-044 | Not reported | 115 | 99 | Wind | Withdrawn |
| GEN-2014-006 | Not reported | 115 | 74.9 | Wind | Withdrawn |
| GEN-2011-018 | Not reported | 115 | 73.6 | Wind | Operational |
| GEN-2010-047 | Not reported | 115 | 72 | Wind | Withdrawn |
| GEN-2023-SR19 | Not reported | 115 | 50 | Battery | Active |
| GEN-2014-004 | Not reported | 115 | 4 | Wind | Operational |
| GEN-2013-008 | Not reported | 115 | 1.2 | Wind | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.