Jackson, KS interconnection queue

1 active project totaling 300 MW in the SPP queue, plus 5 with terminal status (shown grayed).

1active projects
300active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-099 Not reported 345 300 Solar Active
GEN-2017-124 Not reported 345 252 Wind Withdrawn
GEN-2017-126 Not reported 345 252 Wind Withdrawn
GEN-2017-128 Not reported 345 202 Wind Withdrawn
GEN-2017-142 Not reported 345 170 Wind Withdrawn
GEN-2007-020 Not reported n/r 50 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.