Jackson, AR interconnection queue

1 active project totaling 199 MW in the SPP queue, plus 1 with terminal status (shown grayed).

1active projects
199active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-114 Not reported 161 199 Hybrid Active
GEN-2000-001 Not reported n/r 100 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.