Queue IDProjectkVMWResourceStatus
GEN-2023-106 Not reported 345 504 Wind Withdrawn
GEN-2016-017 Not reported 345 250.2 Wind Operational
GEN-2022-068 Not reported 345 250 Wind Withdrawn
GEN-2022-069 Not reported 345 250 Wind Withdrawn
GEN-2022-070 Not reported 345 250 Wind Withdrawn
GEN-2024-202 Not reported 345 250 Wind Withdrawn
GEN-2023-105 Not reported 345 249 Wind Withdrawn
GEN-2016-103 Not reported 345 240 Wind Withdrawn
GEN-2022-169 Not reported 345 220 Hybrid Withdrawn
GEN-2018-129 Not reported 230 200.2 Wind Withdrawn
GEN-2016-094 Not reported 230 200 Wind Operational
GEN-2016-092 Not reported 345 175 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first