Hodgeman, KS interconnection queue
5 active projects totaling 1,803.2 MW in the SPP queue, plus 5 with terminal status (shown grayed).
5active projects
1,803.2active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2021-070 | Not reported | 345 | 504 | Wind | Active |
| GEN-2017-183 | Not reported | 345 | 400 | Wind | Active |
| GEN-2017-184 | Not reported | 345 | 400 | Solar | Active |
| GEN-2011-017 | Not reported | 345 | 299 | Wind | Withdrawn |
| GEN-2021-068 | Not reported | 345 | 249.6 | Wind | Active |
| GEN-2021-069 | Not reported | 345 | 249.6 | Wind | Active |
| GEN-2010-015 | Not reported | 345 | 200.1 | Wind | Withdrawn |
| GEN-2011-016 | Not reported | 345 | 200.1 | Wind | Withdrawn |
| GEN-2010-054 | Not reported | 345 | 200 | Wind | Withdrawn |
| GEN-2017-049 | Not reported | 69 | 50 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.