1 active project totaling 384 MW in the SPP queue, plus 9 with terminal status (shown grayed).

1active projects
384active MW
10total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-089 Not reported 345 400 Solar Withdrawn
ERAS-2025-028 Not reported 345 384 Solar Active
GEN-2020-066 Not reported 345 253.8 Wind Withdrawn
GEN-2016-056 Not reported 230 200 Wind Withdrawn
GEN-2008-131 Not reported n/r 128 Gas Withdrawn
GEN-2014-054 Not reported 230 120 Wind Withdrawn
GEN-2014-053 Not reported 230 80 Wind Withdrawn
GEN-2015-077 Not reported 115 80 Solar Withdrawn
GEN-2015-075 Not reported 69 51.5 Solar Withdrawn
GEN-2014-042 Not reported 115 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.