4 active projects totaling 1,150 MW in the SPP queue, plus 7 with terminal status (shown grayed).

4active projects
1,150active MW
11total filed
Queue IDProjectkVMWResourceStatus
GEN-2006-010 Not reported 138 620 Coal Operational
GEN-2006-011 Not reported n/r 605 Coal Withdrawn
GEN-2022-239 Not reported 345 350 Solar Withdrawn
GEN-2024-226 Not reported 345 300 Solar Active
GEN-2022-240 Not reported 345 200 Battery Withdrawn
GEN-2022-241 Not reported 345 200 Battery Withdrawn
GEN-2024-227 Not reported 345 200 Battery Active
GEN-2024-214 Not reported 115 120 Hybrid Withdrawn
GEN-2023-151 Not reported 138 100 Hybrid Withdrawn
GEN-2022-093 Not reported 115 83 Solar Withdrawn
GEN-2013-011 Not reported 138 30 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first