Substation Scout

Haskell, OK interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-005 Not reported 345 500 Solar Withdrawn
GEN-2023-009 Not reported 138 250 Battery Withdrawn
GEN-2024-315 Not reported 161 130 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.