Substation Scout

Hansford, TX interconnection queue

11 active projects totaling 2,443.8 MW in the SPP queue, plus 9 with terminal status (shown grayed).

11active projects
2,443.8active MW
20total filed
Queue IDProjectkVMWResourceStatus
GEN-2006-044 Not reported 345 370 Wind Operational
GEN-2022-112 Not reported 230 370 Other Withdrawn
GEN-2007-042 Not reported n/r 360 Wind Withdrawn
GEN-2010-014 Not reported 345 358.8 Wind Operational
GEN-2024-045 Not reported 230 345 Solar Active
GEN-2024-046 Not reported 230 345 Solar Active
GEN-2009-041 Not reported 230 300 Wind Withdrawn
GEN-2011-021 Not reported 345 299 Wind Withdrawn
GEN-2011-022 Not reported 345 299 Wind Operational
GEN-2002-008 Not reported 345 240 Wind Operational
GEN-2009-018 Not reported 230 200.1 Wind Withdrawn
GEN-2014-038 Not reported 345 200 Wind Withdrawn
GEN-2023-SR8 Not reported 345 200 Battery Active
GEN-2026-PR4 Not reported 345 131.6 Battery Active
GEN-2021-SR5 Not reported 345 126 Battery Withdrawn
GEN-2007-039 Not reported n/r 120 Wind Withdrawn
GEN-2021-092 Not reported 115 100 Battery Withdrawn
GEN-2002-009 Not reported 115 67.2 Wind Operational
GEN-2025-SR2 Not reported 115 67.2 Wind Active
GEN-2006-020S Not reported 115 20 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first