0 active projects
totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).
0active projects
0active MW
4total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2022-177
Not reported
345
400
Hybrid
Withdrawn
GEN-2007-019
Not reported
n/r
375
Wind
Withdrawn
GEN-2007-011
Not reported
115
135
Wind
Withdrawn
GEN-2008-066
Not reported
n/r
120
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.