Hall, NE interconnection queue

1 active project totaling 80 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
80active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2001-039N Not reported n/r 400 Coal Withdrawn
GEN-2024-349 Not reported 230 300 Solar Withdrawn
GEN-2002-004N Not reported n/r 80 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.