Substation Scout

Gray, TX interconnection queue

1 active project totaling 250 MW in the SPP queue, plus 10 with terminal status (shown grayed).

1active projects
250active MW
11total filed
Queue IDProjectkVMWResourceStatus
GEN-2012-014 Not reported 230 425 Gas Withdrawn
GEN-2007-008 Not reported n/r 300 Wind Withdrawn
GEN-2016-059 Not reported 230 300 Wind Withdrawn
GEN-2024-368 Not reported 115 250 Battery Active
GEN-2007-009 Not reported n/r 200 Wind Withdrawn
GEN-2007-030 Not reported n/r 200 Wind Withdrawn
GEN-2002-021 Not reported n/r 160 Wind Withdrawn
GEN-2007-002 Not reported 115 160 Coal Withdrawn
GEN-2008-053 Not reported n/r 150 Wind Withdrawn
GEN-2005-021 Not reported n/r 85.5 Wind Withdrawn
GEN-2002-020 Not reported n/r 75 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.