Graham, KS interconnection queue

1 active project totaling 75 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
75active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2009-065 Not reported 345 100 Wind Withdrawn
GEN-2024-322 Not reported 115 75 Battery Active
GEN-2010-048 Not reported 115 70 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.